What is a work breakdown structure?
A work breakdown structure, or WBS, organizes the project's scope into deliverables and smaller manageable parts.
By ENRO team
A work breakdown structure, or WBS, organizes the project's scope into deliverables and smaller manageable parts.
How to use it in practice
Build it around the work the project must deliver, then assign responsibility and cost references. Keep the hierarchy understandable to both site and office teams. Tasks and dates can be planned from that scope, but a WBS itself is not a calendar.
A simple example
Illustrative example: a housing development can be broken into blocks, shared infrastructure and external works, with more detailed packages under each.
What to watch for
Do not mistake a long to-do list for a complete scope breakdown. Check for omitted work and overlaps between packages.